Commercial models
Almost every B2B billing model is built from the same four pieces: fixed charges, usage charges, one-time charges and phases. This page shows how they combine for the most common models, so you can recognize yours before configuring anything.
Summary
Sección titulada «Summary»| Model | Pricing example | How it is built in Relvo |
|---|---|---|
| Fixed subscription | USD 1,000 / month | One standard fixed charge |
| Base + seats | USD 500 / month + USD 20 × active user | One fixed charge + one seat-based charge |
| Base + usage | USD 1,000 / month + USD 0.05 × transaction | One fixed charge + one standard usage charge |
| Tiered usage | 1,000 included · then 0.10 · above 5,000, 0.07 | One graduated usage charge |
| Volume discount | If you exceed 5,000, everything at 0.07 | One volume usage charge |
| Package-based | USD 50 per 1,000 calls | One package usage charge |
| GMV commission | 1.5% of transacted value | One percentage usage charge |
| Fixed retainer | USD 3,000 / month | One standard fixed charge |
| Retainer + variable | USD 3,000 / month + USD 100 × meeting | Fixed charge + usage charge |
| One-time charge | Implementation USD 5,000 | One one-time charge, non-recurring |
| Phased contract | Month 1 implementation → then operation | Two phases with different charges |
| Enterprise with OC/HES | Pre-invoice → OC → invoice | Invoicing condition on the contract |
| Guaranteed minimum | USD 2,000 / month minimum against usage | Minimum commitment over the usage charges |
Subscription, with or without usage
Sección titulada «Subscription, with or without usage»The base case: one fixed charge per period. It is billed while the phase is in effect, whether or not there is usage.
Adding usage does not change the contract; it adds a charge. Both are evaluated in the same period and go out on a single invoice, even if one is billed in advance and the other in arrears.
Base + usage, one period
| Line | Timing | Amount |
|---|---|---|
| Platform | In advance | USD 1,000.00 |
| 8,420 conversations, tiered | In arrears | USD 639.40 |
| Total | USD 1,639.40 |
When the price depends on how much is consumed
Sección titulada «When the price depends on how much is consumed»Three distinct models that are often confused:
- Tiered (
graduated) — each tier charges only its own units. This is the “first 1,000 free” model. - Volume (
volume) — the total quantity selects one tier and that price applies to everything. This is the “reach 5,000 and everything gets cheaper” model. - Package (
package) — billed in whole blocks, even if you don’t use them fully.
The same quantity yields very different amounts depending on which one you choose. See Pricing models for the calculation of each.
When the contract changes over time
Sección titulada «When the contract changes over time»A contract with implementation in the first month and operation from the second is not two contracts: it is two phases of the same one. Each phase has its own charges, and the timeline leaves no gaps or overlaps.
The same applies to a mid-year price increase or a plan change: you add a phase, you don’t edit the past. What has already been invoiced keeps reflecting what was in effect when it was invoiced. See Phases.
When there is a floor or a ceiling
Sección titulada «When there is a floor or a ceiling»- Guaranteed minimum — the customer pays at least X per period, regardless of usage. If usage falls below the minimum, the difference is billed.
- Cap — usage is billed up to a maximum; anything beyond it is not invoiced.
- Discounts — percentage or fixed-amount, with or without a limited validity period.
See Discounts, minimums and caps.
When the customer requires prior approval
Sección titulada «When the customer requires prior approval»In corporate accounts, the invoice is not issued until there is a purchase order (OC, orden de compra), a service acceptance sheet (HES) or an internal approval. In Relvo that is an invoicing condition on the contract: the charge is calculated the same way, shared as a pre-invoice, and issuance stays blocked until the evidence arrives — on purpose, because issuing without the OC is what later turns into an invoice rejected by the customer’s accounts payable team. See OC, HES and approvals.
When a charge calculation is split
Sección titulada «When a charge calculation is split»A single calculation can end up in more than one document: by cost center, by subsidiary or by billing account. The charge calculation is still one; what gets split is the issuance.